Feasibility, Permitting & Compliance Essentials
In Costa Rica’s fast-evolving real estate market, successful development begins long before the first shovel hits the ground. Project conceptualization—the phase where ideas become viable plans—sets the foundation for everything that follows. Done well, it reduces risk, protects timelines and budgets, and ensures alignment with the country’s sustainability and regulatory priorities.
As a leading developer founded in 1994 by John Scheman, Grupo Do It has helped transform Guanacaste into a hub for tourism, real estate, and infrastructure. From land acquisition and zoning to environmental reviews, permitting, design, construction, and project management, Grupo Do It delivers high-quality, sustainable projects that create lasting value for local communities and international investors.
Understanding Project Conceptualization in Costa Rica

Project conceptualization involves defining the vision, scope, and objectives—and grounding them in a regulatory environment that emphasizes environmental protection, sustainable growth, and community impact. Weak conceptualization leads to costly redesigns, delays, or compliance issues.
Early diligence should confirm:
- Zoning and land-use alignment (permissible uses, densities, and setbacks).
- Market and stakeholder insights to validate demand and program mix (residential, hospitality, commercial, industrial).
- Preliminary site feasibility for access, utilities, topography, easements, and environmental sensitivity.
Grupo Do It integrates these inputs at the outset—pairing market data with on-the-ground experience—to identify risks early and shape efficient, buildable projects.
The Critical Role of Feasibility Studies
Feasibility studies test whether a project works—technically, economically, environmentally, legally, and operationally.
What to evaluate:
- Technical & site feasibility: soils/geotech, drainage, water and energy access, mobility.
- Environmental feasibility: scoping to determine the correct Environmental Impact Assessment instrument under SETENA (for example, D1 with EIA when impacts are significant, D1-C for low-impact AOPs located in fragile areas, or D2 for low-impact categories), as defined by Decreto Ejecutivo N.º 43898.
- Economic feasibility: development costs, phasing, absorption, revenue models, funding scenarios.
- Legal feasibility: title verification, liens/easements, tax status, and consistency with territorial plans/zoning.
Timeline note: End-to-end entitlements often run ~6–12 months, and municipal construction permits commonly issue in ~2–6 months after prerequisites are met. These are typical ranges—not fixed by statute—and vary by project category, municipality, completeness of files, and whether environmental viability is required.
Navigating the Permitting Process

Costa Rica’s permitting framework protects safety, communities, and ecosystems. As of 2025, no construction may proceed without municipal authorization under the Ley de Construcciones. Submittals and professional endorsements are made through the CFIA’s Administrador de Proyectos de Construcción (APC) digital platform. From APC, teams also handle the INS ‘Riesgos del Trabajo’ policy issuance and municipal fee payment steps associated with a project file.
Typical core steps (sequence varies by project):
- Architectural/engineering plans by licensed professionals (CFIA endorsements via APC).
- Service availability letters (e.g., water from AyA/ASADA, electricity); many municipalities list these as explicit prerequisites.
- Environmental Viability (when applicable) via SETENA, based on the project’s impact category.
- Municipal review and construction permit issuance; worker insurance in place prior to mobilization.
Coastal/Maritime Zone Projects: Special Rules
Projects in the Zona Marítimo-Terrestre (ZMT) carry concession requirements and special restrictions under Ley 6043—including limits on foreign concessionaires (for example, foreigners who have not resided ≥5 years and entities with more than 50% foreign ownership cannot hold concessions). In tourist areas, concessions additionally require approval by the Instituto Costarricense de Turismo (ICT). Early legal scoping is essential for any coastal concept.
Ensuring Legal Compliance for Successful Developments

Costa Rica offers strong property protections; foreigners enjoy the same individual and social rights as citizens (political rights excluded) under Article 19 of the Constitution—subject to exceptions established in law (e.g., ZMT concessions above). Thorough due diligence remains non-negotiable: verify title chain, boundaries, liens, easements, tax status, and zoning consistency before acquisition or design commitments.
For investors exploring immigration benefits, the Investor Residency category minimum is USD 150,000 (reduced from USD 200,000) across qualifying assets (real estate, registrable goods, shares/securities, productive projects), per Law 9996 and its regulation—applied by DGME/ICT. As of 2025, this threshold remains in force.
Why Partner with Grupo Do It
With a portfolio spanning residential communities, hospitality, retail, logistics, and build-to-suit industrial assets, Grupo Do It is a trusted partner for complex developments. The team integrates conceptualization, feasibility, permitting, and compliance into a single workflow—reducing friction and accelerating time-to-market.